HomeElection 2027IndiaWorldSportsEconomy & BusinessShowbizTechnologyJobsVideosLive
Latest
Arjun Sarja's upcoming pan-Indian film inspired by 'Operation Sindoor'; Film to hit screens for Independence Day next yearShobhinaw Satyaa on the 'Hanuman Ansh 2': I am also eagerly waitingAnurag Thakur slams opposition over women’s quota, delimitation and EVM criticismDelimitation 'threat to democracy', BJP wants take power into their own hands forever, says Congress chief Kharge'Rashid still the best England white-ball spinner': Dawson backs veteran despite battle for spin spotsIndia’s port container traffic projected to reach 40 million TEUs by FY3013-member panel to light Tirupparankundram deepathoon at 5 p.m. today amid tight securityKevin Pietersen joins ‘Phulera’ fun ahead of Panchayat Season 5 premiereGIS-based drainage system to be built in HaridwarRavi Kishan reveals vada pav was a ‘good friend’ during his extreme struggling days in Mumbai

Advertisement

World Rivers Day: Restore, Revitalise, Replenish

Follow The Hawk on Google News+ Follow

Advertisement


Living Danube Partnership restoration of Garla Mare wetland in Romania is expected to further increase water retention capacity by 5.2 million m3

Vienna (The Hawk): After years of being exploited, the Danube River's natural inhabitants face a fight to survive. With the The Coca-Cola Foundation and International Commission for the Protection of the Danube River (ICPDR), WWF Central and Eastern Europe (WWF-CEE) is working to put that right. We are working closely with local stakeholders and relevant authorities to reconnect river stretches or floodplains to the river system by opening dams, installing sluices for water retention or by restoring water supply channels. At the same time, a regional movement is being created for wetland conservation and restoration, as well as good water stewardship. The eight-year Living Danube Partnership aims is to increase the water retention capacity by the equivalent of 4,800 Olympic- sized swimming pools (12 million m³) and to restore over 7,422 football pitches worth of wetland habitat (53 km²) by June 2021. We're making progress, but there's work to do.

Advertisement

After a long preparation process, one of our biggest undertakings, the Garla Mare Wetland Restoration in the Lower Danube Green Corridor is now finally approved by the Romanian authorities and fieldwork is underway. To date, the Partnership has undertaken wetland restoration in nine projects over nearly 6,000 hectares in six countries; including Austria, Bulgaria, Croatia, Hungary, Romania and Serbia. So far, measures funded by The Coca-Cola Foundation have increased water retention capacity by 8.5 million m3. Restoration of Garla Mare is expected to further increase capacity for water retention by a 5.2 million m3.

Also readAhead of CWG 2030, AMC unveils four-year plan to boost Ahmedabad’s green cover, curb pollution

Rivers, lakes, wetlands and streams supply drinking water and help us grow the food we eat, as well as supplying manufacturing, biomass and recreation. However, over 80% of the floodplains along the Danube and its main tributaries have been lost -- and with them significant populations of fish and other valuable ecosystem goods and services. According to WWF's new Living Planet Report 2020, 1 in 3 freshwater species are threatened with extinction. For example, monitored populations of sturgeons have dramatically declined by 91% on average between 1970 and 2016. We need healthy freshwater environments to support life on Earth.

Restoration of Garla Mare marshland will return an improved flooding regime to the area and retain a minimum permanent body of open water. The Natura 2000 site is an area of marsh covering about 700 hectares formed in a former side branch of the Danube River. Historically, it was modified for fish farming, including a fish breeding nursery and ponds. The natural marsh was isolated from the river and divided by dykes. Two fish ponds in the eastern part of the fish farm are now abandoned. The fish ponds were supplied with water from springs and water pumped from the Danube.

Advertisement

The project will restore a more natural flow regime across the marsh, including:

Also readDelhi AQI remains in 'poor' category as winter chill intensifies

flood protection will be improved by re-establishing flood storage capacity for a volume of water up to 5,197 mill m3;

re-establishment of the water flow through improving the capacity of a supply channel;

managing reed beds to create open water surfaces;

enablement of flows by opening breaches in dykes at a number of locations; and

dyke reinforcement at active/used fish ponds to protect against flood peaks.

Five restoration projects under the Living Danube Partnership have been completed. Besides Garla Mare, two more projects are expected to be completed in 2020 or in summer 2021: Vrata and the Lankoc floodplain forest. A final project focused on restoring a number of side-arms of the Drava River in Croatia, where the Living Danube Partnership has leveraged significant EU support, will be completed by 2022.

Get The Hawk first on Google

Add The Hawk as a preferred source and Google shows you more of our stories in Top Stories. Follow us on Google News too.

Share this story

Advertisement

TN: IMD issues yellow alert for 23 districts, heavy rain likely in sixRead next →TN: IMD issues yellow alert for 23 districts, heavy rain likely in sixTamil Nadu · 28 Nov 2026, 08:08 AM IST